24
August
2017

The entire project was realized in close collaboration with architect Fogazzi, who planned the renovations. It was indeed a small realization, as the theatre can hold only one-hundred people. However, the result is every bit as outstanding as major structures, thanks to the quality of its seats, finish and fittings, which we laid down in only five days.

Backt to :